Missouri River Water Resource Recovery Facility
The Missouri River Water Resource Recovery Facility (MRWRRF) was built in 1964. Before improvements were completed, the MRWRRF could treat approximately 50 million gallons of wastewater per day during wet weather events. Upgrades now allow the MRWRRF to treat 150 million gallons per day during wet weather flows, ultimately reducing the amount of untreated wastewater sent to the Missouri River. The MRWRRF CSO improvements were completed in three major phases or schedules (A, B1, B2). In addition, a separate project to replace the pumps to ensure reliability was completed in early 2023.
- Schedule A – Facilities were added to provide preliminary and primary treatment of high strength industrial waste from the South Omaha Industrial Area. Schedule A improvements were completed in spring 2014 and include water quality improvements, odor reduction and energy sustainability.
- Schedule B1 – Preliminary and Primary Treatment Facilities were constructed to increase the capacity to 150 million gallons per day during wet weather events. Flows from wet weather events that exceed the 64 million gallons per day biological treatment capacity now receive screening, grit removal and solids removal before being discharged to the Missouri River.
- Schedule B2 – Facilities were added to disinfect flows that received preliminary and primary treatment in excess of the 64 million gallons per day biological treatment capacity before being discharged to the Missouri River. Odor control facilities were constructed to complete the improvements to the primary clarifiers from Schedule B1.
- Transfer Lift Station Pump Replacement – The MRWRRF–Transfer Lift Station Pump Replacement Project was identified to replace the existing five wastewater pumps that have had operational and reliability issues since being placed into service as part of the MRWRRF Schedule A project in 2014. The improvements also included replacement of the two existing stormwater pumps, bridge crane, and other ancillary equipment to support operation of the new pumps.
These improvements, when combined with other projects that are being built to deliver additional wet weather flows to the MRWRRF, will result in a significant reduction in bacterial loading to the Missouri River, consistent with the goals of the Long Term Control Plan (opens in a new tab).
*As of August 2017, the Missouri River Wastewater Treatment Plant (MRWWTP) Improvements Project is now known as the Missouri River Water Resource Recovery Facility (MRWRRF) Improvements Project.
Additional Resources
- Spotlight: MRWRRF Operationally Complete (PDF, opens in a new tab) – May 2020
- Spotlight: Flood Impacts on CSO Program Efforts (opens in a new tab) – Aug. 2019
- Spotlight: Missouri River Water Resource Recovery Facility Improvements (PDF, opens in a new tab) – Nov. 2017
- Spotlight: New Municipal Headworks for the Missouri River WWTP Improvements – Schedule B1 Project (PDF, opens in a new tab) – June 2016
- Final Design Public Meeting (PDF, opens in a new tab) – June 2013
- Preliminary Design Public Meeting – Feb. 2011
JPG
Project Factsheet (PDF, opens in a new tab)
Road Conditions (opens in a new tab)
Completion Date
Schedule A – Q3 2014
Schedule B1 – Q3 2016
Schedule B2 – Q4 2019
Wetlands Mitigation – Q4 2015
Bank Stabilization – Q2 2017
Transfer Lift Station Pump Replacement – Q1 2023
Cost at Completion
Schedule A – $19.6 million
Schedule B1 – $61.8 million
Schedule B2 – $51 million
Wetlands Mitigation – $411,000
Bank Stabilization – $7.1 million
Contact Information
City of Omaha
402-444-5220
Contractor
Hawkins Construction Company
402-342-1607
Project References
LTCP Project Name: Missouri River WWTP Improvement
Construction Contract: OPW 52200 – Missouri River WWTP-Schedule A
Construction Contract: OPW 51875 – Improvements to the Missouri River WWTP-Schedule B1
Construction Contract: OPW 52648 – Improvements to the Missouri River WWTP-Schedule B2
Construction Contract: OPW 52570 – MRWRRF: Wetlands Mitigation
Construction Contract: OPW 52494 – MRWRRF: Bank Stabilization
Construction Contract: OPW 53408 – MRWRRF: Transfer Lift Station Pump Replacement