Vinton Street Green Infrastructure Project
The green infrastructure program was adopted by the City as part of the 2014 Long Term Control Plan (opens in a new tab) Update and included project opportunities in City-owned parks.
The Vinton Street Green Infrastructure Project constructed a subsurface detention facility near 35th and Vinton Street to manage the flow of stormwater into the existing sewer system. Detaining this flow assists with capacity in the downstream system.
This project was built in coordination with the adjacent South Omaha Trail improvement project.
JPG, opens in a new tab
Project Factsheet (PDF, opens in a new tab)
Completed Date
Q4 2016
Cost at Completion
$1.1 million
Contact Information
City of Omaha
Public Works Department
Christine Driscoll
402-444-4966
Project References
Project Number: OPW 52456
LTCP Project Name: Vinton Street Green Infrastructure Project